Willow Pumps Case Studies

Some of our recent installations and maintenance projects

Contact us to arrange an emergency callout
  • Emergency pump station repair at HM Prison Coldingley

    640 words3.2 min read

    Why did the client need our services? After a pump failure, the site maintenance team at HMP Coldingley attempted to lift [...]

    Read more
  • Installation of new cold water booster system at Bradford City Football Club

    435 words2.2 min read

    Why did the client need our services? Our client, Bradford City AFC, found that their stadium lost water pressure during busy [...]

    Read more
  • Drain survey & clean for Redrow Homes

    356 words1.8 min read

    Why did the client need our services? Redrow asked us to carry out an effective clean and survey of the large- [...]

    Read more
  • New GRP chamber for the National Trust

    581 words2.9 min read

    Why did the client need our services? The client was experiencing repeated issues with the existing treatment plant being overwhelmed due [...]

    Read more
  • University of Essex CCTV Drain Investigation

    294 words1.5 min read

    Why did the client need our services? This surface water pumping station was not working properly. The suspected cause was that [...]

    Read more
  • Residential package pumping station between cottages in Yorkshire

    317 words1.6 min read

    Why did the client need our services? The two cottages were connected to a non-compliant septic tank and Willow Pumps were [...]

    Read more
  • Tank replacement & pipe insulation

    261 words1.3 min read

    Why did the client need our services? The existing tank at this hotel was in a very poor state with numerous [...]

    Read more